PXE boot the MS-02 nodes and install Harvester HCI to create the virtualization layer.
Prerequisites:
- Tinkerbell running on UM760 with Harvester workflow
- Hardware XRs registered for all 3 MS-02 nodes
- Physical network configured (2.5GbE to VP6630, SFP+ LACP to switch)
Tasks:
Harvester Cluster:
| Node |
IP (VLAN 10) |
Role |
| ms02-node1 |
10.10.10.11 |
Control Plane + Compute |
| ms02-node2 |
10.10.10.12 |
Control Plane + Compute |
| ms02-node3 |
10.10.10.13 |
Control Plane + Compute |
Expected Duration: ~1.5 hours (Harvester install is slow)
Reference:
docs/architecture/appendices/B_bootstrap_procedure.md (Step 13)
docs/architecture/05_building_blocks/01_harvester_hci.md