Skip to content

Incomplete merge conflicts #138

@krissrex

Description

@krissrex

docs/docs/Panda_Breath.md

Lines 154 to 174 in 1b5b40b

<<<<<<< HEAD
4. Place the Panda Breath at the very back of the Snapmaker U1 chamber, pressing it slightly against the transparent rear panel.
<<<<<<< HEAD
=======
>>>>>>> 2840f704c (modify panda breath en and zh serial error)
>Important: Ensure the bottom of the Panda Breath is suspended—do not let it press on the cable.
=======
4. Position the Module<br>Place the Panda Breath at the very back of the Snapmaker U1 chamber, gently pressing it against the transparent rear panel.<br>
> Important: Ensure the bottom of the Panda Breath is suspended—do not let it press on the cable.
>>>>>>> 0e7cba632bde2614712ad46fb294834edddc4f5d
<img src=img/PandaBreath/U1install06.jpg width="500"/>
<img src=img/PandaBreath/U1install07.jpg width="500"/>
<<<<<<< HEAD
5. Once position is confirmed, fully tighten all 4 screws on the left mounting bracket.
=======
5. Secure the Installation<br>Once the module is correctly positioned, fully tighten all four screws on the left mounting bracket to secure it in place.
>>>>>>> 0e7cba632bde2614712ad46fb294834edddc4f5d

Metadata

Metadata

Assignees

No one assigned

    Labels

    No labels
    No labels

    Projects

    No projects

    Milestone

    No milestone

    Relationships

    None yet

    Development

    No branches or pull requests

    Issue actions