Skip to content

Update Notecard API from upstream schema changes (4003e4cfefec9e85a68… #492

Update Notecard API from upstream schema changes (4003e4cfefec9e85a68…

Update Notecard API from upstream schema changes (4003e4cfefec9e85a68… #492

Triggered via push January 8, 2026 09:20
Status Failure
Total duration 51s
Artifacts
Matrix: build / build
Fit to window
Zoom out
Zoom in

Annotations

9 errors
build / build (3.11)
Process completed with exit code 1.
build / build (3.9)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.9)
Process completed with exit code 1.
build / build (3.10)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.10)
Process completed with exit code 1.
build / build (3.12)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.12)
The operation was canceled.
build / build (3.13)
The strategy configuration was canceled because "build.build._3_11" failed
build / build (3.13)
The operation was canceled.