Skip to content
Merged
Changes from all commits
Commits
File filter

Filter by extension

Filter by extension

Conversations
Failed to load comments.
Loading
Jump to
Jump to file
Failed to load files.
Loading
Diff view
Diff view
Original file line number Diff line number Diff line change
Expand Up @@ -47,7 +47,7 @@ That said, I don’t have any internal insight into Sentry’s operations beyond
Pull requests don’t stop coming in just because deployments pause. Instead, they pile up, waiting for the freeze to lift.

<iframe
src="https://metrics.dxta.dev/getsentry/sentry?chart=MRsOpened&team=1&width=1100&height=360&lines=value&theme=light&dashboard=sentry-feature-freeze"
src="https://metrics.dxta.dev/getsentry/sentry?chart=MRsOpened&team=1&weeks=2024-W48,2024-W49,2024-W50,2024-W51,2024-W52,2025-W01,2025-W02,2025-W03,2025-W04,2025-W05,2025-W06,2025-W07&width=1100&height=360&lines=value&theme=light&dashboard=sentry-feature-freeze"
height="360"
style={{border: "none", width: "100%", overflowY: "hidden"}}
>
Expand All @@ -59,7 +59,7 @@ The only significant dip occurs in Week 52 (Dec 23 – Dec 29), but activity reb
Since PRs aren’t being merged and deployed, the time from PR creation to deployment explodes. What was once a smooth, continuous flow turns into a backlog nightmare.

<iframe
src="https://metrics.dxta.dev/getsentry/sentry?chart=DeployTime&team=1&width=1100&height=360&lines=median&theme=light&dashboard=sentry-feature-freeze"
src="https://metrics.dxta.dev/getsentry/sentry?chart=DeployTime&team=1&weeks=2024-W48,2024-W49,2024-W50,2024-W51,2024-W52,2025-W01,2025-W02,2025-W03,2025-W04,2025-W05,2025-W06,2025-W07&width=1100&height=360&lines=median&theme=light&dashboard=sentry-feature-freeze"
height="360"
style={{border: "none", width: "100%", overflowY: "hidden"}}
>
Expand All @@ -75,7 +75,7 @@ The backlog didn’t clear up as expected—new spikes in Weeks 02, 03, and 04 i
Once the freeze lifts, everything hits production at once. Instead of small, iterative changes, you get a flood of deployments, increasing the risk of failures.

<iframe
src="https://metrics.dxta.dev/getsentry/sentry?chart=DeployFreq&team=1&width=1100&height=360&lines=value&theme=light&dashboard=sentry-feature-freeze"
src="https://metrics.dxta.dev/getsentry/sentry?chart=DeployFreq&team=1&weeks=2024-W48,2024-W49,2024-W50,2024-W51,2024-W52,2025-W01,2025-W02,2025-W03,2025-W04,2025-W05,2025-W06,2025-W07&width=1100&height=360&lines=value&theme=light&dashboard=sentry-feature-freeze"
width="1100"
height="360"
style={{border: "none", width: "100%", overflowY: "hidden"}}
Expand All @@ -96,7 +96,7 @@ Now, the team is dealing with the aftermath; stabilizing, fixing issues, and get
When pressure mounts, teams are more likely to merge PRs without full reviews. This is a natural reaction to large backlogs but introduces long-term quality concerns.

<iframe
src="https://metrics.dxta.dev/getsentry/sentry?chart=MRsWoReview&team=1&width=1100&height=360&lines=value&theme=light&dashboard=sentry-feature-freeze"
src="https://metrics.dxta.dev/getsentry/sentry?chart=MRsWoReview&team=1&weeks=2024-W48,2024-W49,2024-W50,2024-W51,2024-W52,2025-W01,2025-W02,2025-W03,2025-W04,2025-W05,2025-W06,2025-W07&width=1100&height=360&lines=value&theme=light&dashboard=sentry-feature-freeze"
width="1100"
height="360"
style={{border: "none", width: "100%", overflowY: "hidden"}}
Expand Down
Loading