Skip to content

Bump ajv from 5.2.5 to 6.12.3#2

Open
dependabot[bot] wants to merge 1 commit intomasterfrom
dependabot/npm_and_yarn/ajv-6.12.3
Open

Bump ajv from 5.2.5 to 6.12.3#2
dependabot[bot] wants to merge 1 commit intomasterfrom
dependabot/npm_and_yarn/ajv-6.12.3

Conversation

@dependabot
Copy link
Contributor

@dependabot dependabot bot commented on behalf of github Feb 13, 2022

Bumps ajv from 5.2.5 to 6.12.3.

Release notes

Sourced from ajv's releases.

v6.12.3

Pass schema object to processCode function Option for strictNumbers (@​issacgerges, #1128) Fixed vulnerability related to untrusted schemas (CVE-2020-15366)

v6.12.2

Removed post-install script

v6.12.1

Docs and dependency updates

v6.12.0

Improved hostname validation (@​sambauers, #1143) Option keywords to add custom keywords (@​franciscomorais, #1137) Types fixes (@​boenrobot, @​MattiAstedrone) Docs:

v6.11.0

Time formats support two digit and colon-less variants of timezone offset (#1061 , @​cjpillsbury) Docs: RegExp related security considerations Tests: Disabled failing typescript test

v6.10.2

Fix: the unknown keywords were ignored with the option strictKeywords: true (instead of failing compilation) in some sub-schemas (e.g. anyOf), when the sub-schema didn't have known keywords.

v6.10.1

Fix types Fix addSchema (#1001) Update dependencies

v6.10.0

Option strictDefaults to report ignored defaults (#957, @​not-an-aardvark) Option strictKeywords to report unknown keywords (#781)

v6.9.0

OpenAPI keyword nullable can be any boolean (and not only true). Custom keyword definition changes:

  • dependencies option in to require the presence of keywords in the same schema.
  • more strict validation of the definition using JSON Schema.

v6.8.0

Docs: security considerations. Meta-schema for the security assessment of JSON Schemas.

v6.7.0

Option useDefaults: "empty" to replace null and "" (empty strings) with default values (in addition to assigning defaults to missing and undefined properties). Update draft-04 meta-schema to remove incorrect usage of "uri" format.

... (truncated)

Commits
  • 521c3a5 6.12.3
  • bd7107b Merge pull request #1229 from ajv-validator/dependabot/npm_and_yarn/mocha-8.0.1
  • 9c26bb2 Merge pull request #1234 from ajv-validator/dependabot/npm_and_yarn/eslint-7.3.1
  • c6a6daa Merge branch 'master' into dependabot/npm_and_yarn/mocha-8.0.1
  • 15eda23 Merge branch 'master' into dependabot/npm_and_yarn/eslint-7.3.1
  • d6aabb8 test: remove node 8 from travis test
  • c4801ca Merge pull request #1242 from ajv-validator/refactor
  • 988982d ignore proto properties
  • f2b1e3d whitespace
  • 65e3678 Merge pull request #1239 from GrahamLea/patch-1
  • Additional commits viewable in compare view

Dependabot compatibility score

Dependabot will resolve any conflicts with this PR as long as you don't alter it yourself. You can also trigger a rebase manually by commenting @dependabot rebase.


Dependabot commands and options

You can trigger Dependabot actions by commenting on this PR:

  • @dependabot rebase will rebase this PR
  • @dependabot recreate will recreate this PR, overwriting any edits that have been made to it
  • @dependabot merge will merge this PR after your CI passes on it
  • @dependabot squash and merge will squash and merge this PR after your CI passes on it
  • @dependabot cancel merge will cancel a previously requested merge and block automerging
  • @dependabot reopen will reopen this PR if it is closed
  • @dependabot close will close this PR and stop Dependabot recreating it. You can achieve the same result by closing it manually
  • @dependabot ignore this major version will close this PR and stop Dependabot creating any more for this major version (unless you reopen the PR or upgrade to it yourself)
  • @dependabot ignore this minor version will close this PR and stop Dependabot creating any more for this minor version (unless you reopen the PR or upgrade to it yourself)
  • @dependabot ignore this dependency will close this PR and stop Dependabot creating any more for this dependency (unless you reopen the PR or upgrade to it yourself)
  • @dependabot use these labels will set the current labels as the default for future PRs for this repo and language
  • @dependabot use these reviewers will set the current reviewers as the default for future PRs for this repo and language
  • @dependabot use these assignees will set the current assignees as the default for future PRs for this repo and language
  • @dependabot use this milestone will set the current milestone as the default for future PRs for this repo and language

You can disable automated security fix PRs for this repo from the Security Alerts page.

Bumps [ajv](https://github.com/ajv-validator/ajv) from 5.2.5 to 6.12.3.
- [Release notes](https://github.com/ajv-validator/ajv/releases)
- [Commits](ajv-validator/ajv@v5.2.5...v6.12.3)

---
updated-dependencies:
- dependency-name: ajv
  dependency-type: direct:development
...

Signed-off-by: dependabot[bot] <support@github.com>
@dependabot dependabot bot added the dependencies Pull requests that update a dependency file label Feb 13, 2022
Sign up for free to join this conversation on GitHub. Already have an account? Sign in to comment

Labels

dependencies Pull requests that update a dependency file

Projects

None yet

Development

Successfully merging this pull request may close these issues.

0 participants