Skip to content

Pull requests: openshift/cluster-ingress-operator

Author
Filter by author
Loading
Label
Filter by label
Loading
Use alt + click/return to exclude labels
or + click/return for logical OR
Projects
Filter by project
Loading
Milestones
Filter by milestone
Loading
Reviews
Assignee
Filter by who’s assigned
Assigned to nobody Loading
Sort

Pull requests list

[WIP] OCPBUGS-74508: Remove the GatewayAPI feature gate do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1366 opened Feb 23, 2026 by rhamini3 Loading…
draft PR for rtunning test do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1364 opened Feb 18, 2026 by rhamini3 Draft
OCPSTRAT-1672: Update to use the user specified armEndpoint jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1363 opened Feb 13, 2026 by dmc5179 Loading…
NE-2216: parameterize haproxy version jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1362 opened Feb 13, 2026 by jcmoraisjr Loading…
[WIP] NE-2418: Add e2e test for haproxy_max_connections metric do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1361 opened Feb 13, 2026 by alebedev87 Loading…
CORS-4335: Add support for AWS European Sovereign Cloud jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1360 opened Feb 13, 2026 by tthvo Loading…
[WIP] NE-2471: Replace OLM-based Istio install with Sail Library do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1358 opened Feb 12, 2026 by rikatz Loading…
MON-4501: Migrate Prometheus targets discovering from Endpoints to EndpointSlices jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1357 opened Feb 9, 2026 by machine424 Loading…
OCPBUGS-74511: remove RouteExternalCertificate feature gate jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. verified Signifies that the PR passed pre-merge verification criteria
#1355 opened Feb 3, 2026 by jcmoraisjr Loading…
[WIP] NE-2471: Replace OLM-based Istio install with Sail Library do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1354 opened Feb 3, 2026 by gcs278 Loading…
5 of 12 tasks
chore(ossm): Bump to OSSM 3.2.2 and Istio 1.27.5 do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1350 opened Jan 26, 2026 by aslakknutsen Draft
OCPBUGS-54702: change default timeout tunnel if using AWS NLB jira/severity-moderate Referenced Jira bug's severity is moderate for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. verified Signifies that the PR passed pre-merge verification criteria
#1349 opened Jan 22, 2026 by jcmoraisjr Loading…
NE-2390: Adding AGENTS.md file jira/valid-reference Indicates that this PR references a valid Jira ticket of any type.
#1341 opened Jan 15, 2026 by Thealisyed Loading…
Add docs/DESIGN.md do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1339 opened Jan 10, 2026 by Miciah Draft
NE-2376: Remove restriction of unmanaged x-k8s.io approved Indicates a PR has been approved by an approver from all required OWNERS files. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged. tide/merge-method-squash Denotes a PR that should be squashed by tide when it merges. verified Signifies that the PR passed pre-merge verification criteria
#1336 opened Jan 7, 2026 by rikatz Loading…
gatewayclass: Enable Horizontal Pod Autoscaling do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress.
#1326 opened Dec 16, 2025 by Miciah Draft
OCPBUGS-65476: Add openshift-ingress-operator ClusterRole to ClusterO… jira/invalid-bug Indicates that a referenced Jira bug is invalid for the branch this PR is targeting. jira/severity-low Referenced Jira bug's severity is low for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lgtm Indicates that a PR is ready to be merged.
#1313 opened Nov 28, 2025 by davidesalerno Loading…
OCPBUGS-65629: ensure canary daemon set uses its own service account. approved Indicates a PR has been approved by an approver from all required OWNERS files. do-not-merge/hold Indicates that a PR should not merge because someone has issued a /hold command. jira/severity-critical Referenced Jira bug's severity is critical for the branch this PR is targeting. jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. qe-approved Signifies that QE has signed off on this PR
#1310 opened Nov 24, 2025 by ehearne-redhat Loading…
OCPBUGS-62627: cluster operator ingress reported Progressing=True wit… jira/valid-bug Indicates that a referenced Jira bug is valid for the branch this PR is targeting. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. qe-approved Signifies that QE has signed off on this PR
#1299 opened Oct 31, 2025 by davidesalerno Loading…
Add support for TLS curves in router deployment configuration do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/stale Denotes an issue or PR has remained open with no activity and has become stale.
#1287 opened Sep 30, 2025 by richardsonnick Draft
[WIP][NE-2131] OTE - Implement initial framework and tests do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed. needs-rebase Indicates a PR cannot be merged because it has merge conflicts with HEAD.
#1284 opened Sep 24, 2025 by rikatz Loading…
DNM/SPLAT-2468: spike/aws-nlb/internal/proxy: enforce proxy proto on internal NLB IC do-not-merge/work-in-progress Indicates that a PR should not merge because it is a work in progress. jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#1276 opened Sep 2, 2025 by mtulio Draft
NE-2115: Implement httpsLogFormat and tcpLogFormat for Ingress Operator jira/valid-reference Indicates that this PR references a valid Jira ticket of any type. lifecycle/rotten Denotes an issue or PR that has aged beyond stale and will be auto-closed.
#1274 opened Aug 26, 2025 by rohara Loading…
ProTip! no:milestone will show everything without a milestone.